TEST SITE

Heaters

Section Code 1465 : Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.

Back To Directory Sections

#2011037

Range of wall mounted combination boilers providing domestic hot water via a plate heat exchanger and pressurised central heating system. Incorporating a pressure relief valve and expansion vessel. Primary circuit has a maximum working pressure of 3.5 bar and operating temperature of 85°C. Secondary circuit has a maximum working pressure of 10.0 bar and operating temperature of 60°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2011037
Size:
½” BSP male inlet and outlet (DHW). ¾” BSP male inlet and outlet (CH).
Marking:
Lukey on adhesive label on front.
Installation Requirements:
R001 R140
Expiry date:
30/11/2025
Model:
Lukey solution HE (18kW CH & 26kW DHW). Lukey solution HE+ (18kW CH & 26kW DHW). Lukey solution HES+ (18kW CH & 26kW DHW). Lukey solution CBU (18kW CH & 26kW DHW). Beginning February 2021 the models will be named: Lukey 28 HE (18kW CH & 26kW DHW). Lukey 28 HE+ (18kW CH & 26kW DHW). Lukey 28 HES+ (18kW CH & 26kW DHW). Lukey 28 CBU (18kW CH & 26kW DHW).
Product Images

Approval Holder:
Lukey Cassette Boilers (UK) Ltd.
Company Name
Lukey Cassette Boilers (UK) Ltd.
Postcode
BH24 2BB

View All Listings by this Company
Manufacturer:
Lukey Cassette Boilers (UK) Ltd.
Company Name
Lukey Cassette Boilers (UK) Ltd.
Postcode
BH24 2BB

View All Listings by this Company

Print This Approval


#2011033

RINNAI range of wall mounted combination boilers.The unit incorporates a stainless-steel plate heat exchanger pressure relief valve set at 3.0 bar and an expansion vessel on the primary circuit. Maximum working pressure of primary circuit is 2.5 bar and secondary circuit is 10.0 bar. Maximum operating temperature 60˚C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2011033
Size:
Primary circuit: ¾” (M) BSP inlet and outlet. Secondary circuit: ½” (M) BSP inlet and outlet
Marking:
Rinnai on front. Rinnai, model and technical information on adhesive label on side of unit.
Installation Requirements:
R001 R140 R360
Expiry date:
30/11/2025
Model:
ZEN i24 Combi Boiler – REB-KBI2424FF. ZEN i29 Combi Boiler – REB-KBI2929FF. ZEN i34 Combi Boiler – REB-KBI3535FF.
Product Images

Approval Holder:
Rinnai UK Ltd
Company Name
Rinnai UK Ltd
Address
9 Christleton Court Manor Park Runcom
Postcode
WA7 18T
Phone
01928 531 870
General Email
info@rinnaiuk.com

View All Listings by this Company

Print This Approval


#2012051

Range of wall mounted combination boilers providing domestic hot water via a plate heat exchanger and pressurised central heating system, incorporating a pressure relief valve set at 3.0 bar and expansion vessel on the primary circuit. The inlet of the replenishing valve between the primary and secondary circuits incorporate a plastic strainer. Maximum working pressure 2.5 bar (primary) and 6.0 bar (secondary). Maximum operating temperature 85˚C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2012051
Size:
½” BSP (M) inlet and outlet Secondary Circuit. ½” BSP (M) replenishing valve. ¾” BSP(M) inlet and outlet primary circuit.
Marking:
Strom on front of body. Model and technical info on adhesive label on side of body.
Installation Requirements:
R001 R140 R360
Expiry date:
31/12/2025
Model:
Strom E range comprising of models: SBSP7C, SBSP11C & SBSP15C. SBTP18C, SBTP21C & SBTP24C. The number in model indicates kW rating.

Approval Holder:
STROM LTD
Company Name
STROM LTD

View All Listings by this Company

Print This Approval


#2101042

LCB700 range of internal and external oil-fired condensing combination boilers providing domestic hot water and pressurised central heating via a plate heat exchanger. The products are supplied with a temporary filling loop which incorporates a combined isolation valve and double check valve assembly (suitable for backflow protection against Fluid Category 3), stainless steel braided EPDM lined flexible hose assembly and an isolation valve. The primary (space heating) circuit incorporates an expansion vessel and a pressure relief valve (set at 3.0 bar). Operating parameters: Primary (space heating) circuit: Maximum working pressure 2.5 Bar. Maximum operating temperature 105°C. Secondary (DHW) circuit: Maximum working pressure 10.0 Bar. Maximum operating temperature 85°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2101042
Size:
Primary (space heating) circuit: 22mm pushfit. Secondary (DHW) circuit: 15mm pushfit.
Marking:
Navien, model and technical information on adhesive label on rear of front cover.
Installation Requirements:
R001 R140 R360 R430
Expiry date:
31/01/2026
Model:
Internal: LCB700-21LC. LCB700-28LC. LCB700-36LC. External: LCB700-21LCX. LCB700-28LCX. LCB700-36LCX
Product Images

Approval Holder:
KD Navien Co Ltd
Company Name
KD Navien Co Ltd
Address
4F Koami Bldg, 22 Gukhoe daero, 76-gil, Yeongdeungpo-gu, Seoul, 07238 Korea
Phone
+82 2 3489 2200
General Email
www.navien.com

View All Listings by this Company

Print This Approval


#2011358

Range of heat interface units (HIU) with either twin or single stainless steel copper brazed plate heat exchangers (depending on model) providing heating and hot water (twin unit) hot water only, or heating only. The hot water is generated via a plate heat exchanger. The primary (space heating) circuit incorporates an expansion vessel and a pressure relief valve (set at 3.0 bar). The product incorporates a CAb backflow prevention device (suitable for backflow protection against Fluid Category 3) for filling the heating circuit. The inlet and outlet of all circuits incorporate a lever operated spherical valve. Maximum working pressures and operating temperatures: Primary (district heating): 10.0 bar and 85˚C. Domestic hot water (DHW): 10.0 bar and 60˚C. Secondary (space heating): 2.5 bar and 80˚C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2011358
Size:
22mm solder fitting
Marking:
Albion water management, model and other tech info on data label on the side panel.
Installation Requirements:
R001 R140
Expiry date:
30/11/2025
Model:
[Twin Unit]: Standard Twin Plate – heating with 24 plates and hot water with either 14 or 40 plates. Heating connection to cold water by filling loop. Products: TH000240 MTA TWIN 24-40 TH000214 MTA TWIN 24-14 TH001240 MTA TWIN 24-40 HM TH001214 MTA TWIN 24-14 HM [Hot Water Only]: Hot water with either 14 or 40 plates, connection direct to cold water. Products: TH000414 MTA HOT WATER ONLY 00-14 TH000440 MTA HOT WATER ONLY 00-40 TH001414 MTA HOT WATER ONLY 00-14 HM TH001440 MTA HOT WATER ONLY 00-40 HM [Heating Only]: Heating with 40 plates on domestic heating circuit only, connection to cold water via filling loop. Products: TH000340 MTA HEATING ONLY 40-00 TH001340 MTA HEATING ONLY 40-00 HM ‘HM’ stands for heat meter which is on the heating circuit
Product Images

Approval Holder:
Albion Water Management
Company Name
Albion Water Management
Address
30-31 Station Close, Potters Bar, Hertfordshire
Postcode
EN6 1TL
Phone
01707 607230
General Email
water@albiongroup.co.uk

View All Listings by this Company
Manufacturer:
Albion Water Management
Company Name
Albion Water Management
Address
30-31 Station Close, Potters Bar, Hertfordshire
Postcode
EN6 1TL
Phone
01707 607230
General Email
water@albiongroup.co.uk

View All Listings by this Company

Print This Approval


#2107804

Ranges of wall hung, gas-fired condensing combination boilers providing domestic hot water via a plate heat exchanger and pressurised central heating system incorporating an expansion vessel and pressure relief valve set at 3.0 bar. The supplies to both domestic hot water and primary are controlled via spherical valves. Products are supplied with a rigid filling loop or keyless filling link. Maximum working pressure of the primary circuit is 2.5 bar & maximum supply pressure of the secondary circuit is 8.0 bar. Cold water supply only. Maximum operating temperature 95°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2107804
Size:
Primary: 28mm compression. Secondary: 15mm compression.
Marking:
Baxi on front of boiler.
Installation Requirements:
R001 R140 R360
Expiry date:
31/07/2026
Model:
Baxi 224 Combi (product code 7656160). Baxi 228 Combi (7656161). Baxi 424 Combi (7656162). Baxi 428 Combi (7656163). Baxi 428 Combi LPG (7676760).

Approval Holder:
Baxi Heating UK Ltd.
Company Name
Baxi Heating UK Ltd.
Address
Club Street Bamber Bridge Preston Lancaster
Postcode
PR5 6FN

View All Listings by this Company
Manufacturer:
Baxi Spa
Company Name
Baxi Spa
Address
Via Trozzetti 20 36061 Bassano del Grappa (VI)
Country
Italy
Phone
Tel: +39 0424 517 111 Fax: +39 0424 38089

View All Listings by this Company

Print This Approval


#2111311

Range of wall hung, gas-fired condensing combination boilers providing domestic hot water via a plate heat exchanger. The pressurised central heating system incorporates an expansion vessel and pressure relief valve set at 3.0 bar. The supplies to both domestic hot water and primary are controlled via spherical valves. The primary circuit has a maximum working pressure of 2.5 bar. The secondary circuit has maximum working pressure of 10.0 bar. Maximum supply temperature is 60°C. Maximum operating temperature of secondary circuit is 85°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2111311
Size:
Primary: 22mm compression inlet/outlet. Secondary: 15mm compression.
Marking:
Worcester and Worcester logo on front of boiler.
Installation Requirements:
R001
Expiry date:
30/11/2026
Model:
7-733-600-371: Greenstar 4000 25 Combi NG. 7-733-600-372: Greenstar 4000 25 Combi LPG. 7-733-600-373: Greenstar 4000 30 Combi NG. 7-733-600-374: Greenstar 4000 30 Combi LPG.
Product Images

Approval Holder:
Bosch Thermotechnology Ltd.
Company Name
Bosch Thermotechnology Ltd.
Address
Cotswold Way Warndon Worcester
Postcode
WR4 9SW
Country
United Kingdom
Phone
0844 892 9900

View All Listings by this Company
Manufacturer:
Bosch Thermotechnology Ltd. Bosch Thermotechnik GmbH. Bosck Termoteknik Sanayu ve Ticaret A.S.
Company Name
Bosch Thermotechnology Ltd. Bosch Thermotechnik GmbH. Bosck Termoteknik Sanayu ve Ticaret A.S.
Address

View All Listings by this Company

Print This Approval


#2111349

Range of floor standing gas fired combination boilers providing domestic hot water via a stainless-steel plate heat exchanger. Unit is supplied with a safety relief valve (8.0 bar). Maximum working pressure 7.5 bar. Maximum operating temperature 85°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2111349
Size:
2 ½” BSP (M)
Marking:
Eco Heating Systems Senator+ on front casing.
Installation Requirements:
R001 R140 R360
Expiry date:
30/11/2026
Model:
Senator 400 WW Senator 500 WW
Product Images

Approval Holder:
Eco Heating Systems B/V
Company Name
Eco Heating Systems B/V
Address
Rigaweg 10, 9723 TH Groningen
Country
Netherlands
Phone
+31 6 86823847
General Email
h.jans@ecohs.nl

View All Listings by this Company
Manufacturer:
Eco Heating Systems B/V
Company Name
Eco Heating Systems B/V
Address
Rigaweg 10, 9723 TH Groningen
Country
Netherlands
Phone
+31 6 86823847
General Email
h.jans@ecohs.nl

View All Listings by this Company

Print This Approval


#2110320

Range of wall hung, gas-fired condensing combination boilers providing domestic hot water via a plate heat exchanger and pressure relief valve set at 3.0 bar. The supplies to both primary hot water and secondary are controlled via spherical valves. The boilers incorporate a filling loop assembly which incorporates a double check valve assembly (suitable for backflow protection against Fluid Category 3). Primary circuit: Maximum working pressure 2.5 bar. Maximum operating temperature 82°C. Secondary circuit: Maximum working pressure 10.0 bar. Maximum operating temperature 60°C

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2110320
Size:
22mm compression
Marking:
Worcester (brand of Bosch) on front of boiler. Worcester, address, model, serial No. & other tech info on adhesive label on inside of panel.
Installation Requirements:
R001
Expiry date:
31/10/2026
Model:
Greenstar Highflow range comprising of model numbers: 7 731 600 098 (model code: 440CDi ErP). 7 731 600 099 (440CDi ErP). 7 731 600 100 (550CDi ErP). 7 731 600 101 (550CDi ERP).
Product Images

Approval Holder:
Bosch Thermotechnology Ltd.
Company Name
Bosch Thermotechnology Ltd.
Address
Cotswold Way Warndon Worcester
Postcode
WR4 9SW
Country
United Kingdom
Phone
0844 892 9900

View All Listings by this Company
Manufacturer:
Bosch Thermotechnology Ltd.
Company Name
Bosch Thermotechnology Ltd.
Address
Cotswold Way Warndon Worcester
Postcode
WR4 9SW
Country
United Kingdom
Phone
0844 892 9900

View All Listings by this Company

Print This Approval


#2111371

Range of floor standing gas fired combination boilers providing domestic hot water via a stainless-steel plate heat exchanger. Unit is supplied with a safety relief valve (8.0 bar). Maximum working pressure 7.5 bar. Maximum operating temperature 85°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2111371
Size:
2 ½” BSP (M)
Marking:
Lochinvar on front casing. Lochinvar , model & serial number on adhesive label on body
Installation Requirements:
R001 R140 R360
Expiry date:
30/11/2026
Model:
TTW410 & TTW580 FLOOR STANDING GAS FIRED COMBINATION BOILERS

Approval Holder:
Lochinvar Ltd.
Company Name
Lochinvar Ltd.
Address
7 Lombard Way The MXL Centre Banbury
Postcode
OX16 4TJ
Country
Oxon
Phone
+44 (0) 1295 269981
General Email
general@lochinvar.ltd.uk

View All Listings by this Company

Print This Approval



Back To Directory Sections

Page 1 of 3

We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.