Section Code 5030 : Factory applied pipe & fittings coatings.
Back To Directory Sections'Primgreen LAT 12035 & Unbrako wiscoat polyamide 11, ESY Blue 7265' coating system. Factory applied, blue coloured, polyamide powder coating system. Apply primer (Primgreen LAT 12035) and top coat (Unbrako wiscoat polyamide 11, ESY Blue 7265) as per user instructions ‘TSW/PR/02 REVISION A dated: 13.02.2012’. Cure both primer and topcoat for 12 minutes@215°C (each). For use with water up to 23°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Apcoflor MFP 140 Primer and Smartcare Polyurea PW Coating'. Factory applied, grey coloured (once mixed), two-component primer (non-water contact primer) and two-component coating (water contact coating). Mix Apcoflor MFP 140 Primer in a 1:1 mix ratio and apply as per Product Data Sheet ‘Version ‘0’, dated ‘Aug.2007’. Cure for 2 hours@25°C. Then mix and apply Smartcare Polyurea PW Coating as per Product Data Sheet ‘V01’, dated ‘8/2022’. Cure for 1 minute@25°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Clean Tech HPEC 1001(J) Grey'. Factory applied, two-part, grey coloured (once mixed) polyurethane coating. Mix Parts A & B in a 3:1 volume ratio and apply as per manufacturer's product datasheet 'CCPL/HPCCDN/SPL/20-21/5 /C/R11/PS/R3/90s/F', issue date '15.01.2021'. Cure for 7 days@30°C. For use with water up to 35°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Endoprene 888.56'. Factory applied, beige coloured, two-part PU coating. Mix Parts A & B in a 75:25 volume ratio and apply as per Technical Data Sheet dated 09/12/2020. Cure for 8 days@20°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Resicoat PI (HKH01R)'. Factory applied, green coloured epoxy powder coating. Pre-heat the substrate to 180°C and apply and cure in accordance with Product Datasheet dated August 11, 2022. Post-cure for 30 minutes@230°C. For use with water up to 85°C. This material is only approved for the pre-heat and post-cure conditions that appear on the approval. If the pre-heat and/or post-cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 44 of 69
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.