Section Code 5030 : Factory applied pipe & fittings coatings.
Back To Directory Sections'GTH-CC Ice Grey'. Factory applied, two-component, white coloured epoxy coating. Mix parts A & B in a 20:4 mass ratio. Apply as per manufacturer's painting guide '202105006' dated 'May 27, 2021'. Cure for 21 days@23°C. For use with water up to 65°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Lacaze Radiant'. Factory applied, two part, yellow coloured epoxy coating. Mix parts A & B in a 100:26 weight ratio and apply as per Technical Data Sheet 'NT-0229-UK-201109-C' dated 11/05/2022. Cure for 16 hours@70°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the materials are not covered by the scope of the approval.
'RC851'. Factory applied, two part, yellow coloured epoxy coating. Mix parts A & B in a 100:26 weight ratio and apply as per Technical Data Sheet 'NT-0229-UK-201109-C' dated 11/05/2022. Cure for 16 hours@70°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the materials are not covered by the scope of the approval.
'Tianbao SS Epoxy Coating'. Factory applied, two-component white coloured epoxy coating. Mix component 1 and component 2 in a mass ratio of 6:1 and apply as per manufacturer's operation in instructions 'Tianbao SS', 'version 1.0' issued on '06/02/2021'. Cure for 7 days@25°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Epigard DT High Build Finish Epoxy Coating'. Factory applied, two-component, grey coloured epoxy coating. Mix and apply as per manufacturer's instructions ‘Document Ref : SPL/R&D/TTD/UI/001, Issue No.01, Version: 01’ dated 01.11.2015. Cure for 7 days@30°C. For use with water up to 23°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 35 of 69
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.